Assist Salunda (Manufacturer/supplier) on site survey.
Provide 4 man rope access team.
Follow Salunda installation plan.
Install Salunda wireless Latch Hawk™ system to all
latches on the bellyboard.
Install safety lanyards to all sensors and re route
existing latch secondary retention for better
installation.
Install x2 gateway receivers at bellyboard level & x1
concentrator above drill cabin.
Client feedback – “ K2 team displayed true
professionalism during installation and assisted with new
improved methods that we (Salunda) shall use in future
typical projects”.