Project carried out in Sembcorp Marine shipyard in Singapore.
Supply 5 man team of rig builders.
Inspect all the pipe spools and target blocks with client.
Layout material and clean up all flange connections.
Part assemble target blocks to spool pieces.
Lift up all spools from dry dock to drill floor.
Rig up deflector sheaves in derrick for tuggers.
Install all spools for mud 1& 2,cement,frac & production lines.